Projects

Current Projects

 

·       Nadzab Airport Reconstruction Project – Civil Works Package

·       Motukea International Terminal Reconstruction Project

·       9 Mile to Laloki Road Reconstruction Project

Completed Projects

Port Moresby International Airport (PMIA) Asphalt Overlay Works

Prime Contractor
Works included profiling/milling of existing asphalt surfaces, manufacture and place 32,000 ton of asphalt to airport specification, RESA area reconstruction, main runway and taxiway overlay and general purpose apron reconstruction and reseal.

Amount of contract: 68 Million Kina
Name of Employer: National Airports Corporation (NAC)
Award Date: 27 November 2017
Completion Date: 30 October 2018

 

Rangeview Heights Mixed Use Development Project

Project consisted of bulk and detailed earthworks, access road construction, stormwater and drainage, residential and industrial subdivision – services.

The project required detailed earthworks with different pad levels, rock anchors and retaining walls to be constructed to major cut areas and full subdivision services to be installed.

Amount of contract: 18 Million Kina
Name of Employer: Lamana Development Limited
Award Date: 29 June 2018
Completion Date: May 2019

Reconstruction of Independence Drive

Prime Contractor
Work included construction and upgrading of existing road to four lane divided road, drainage upgrade underground utilities, water reticulation system, telecommunication, electrical and road furniture and associated works including construction of six lane access road to the Parliament House in Port Moresby.

Amount of contract: 18 Million Kina
Name of Employer: National Capital District Commission (NCDC)
Award Date: July 2018
Completion Date: October 2018

 
sir reuben taureka highway

Design and Construction of Sir Reuben Taureka Highway

Brief description of the works: Prime Contractor
The project was a design and construction of 11.4 km of 4 lane, dual carriageway with 5 roundabouts, bridge, culverts, stone pitched and rock lined drainage, medium strips, kerbs, bus bays and street lighting.

The project was completed in 15 months with over 1 million man hours worked, over 310,000 tons of earthworks, 220,000 tons of road base placed and 178,000m2 of prime seal and asphalt.

Amount of contract: 167 Million Kina
Name of Employer: National Capital District Commission (NCDC)
Award Date: 5 July 2015
Completion Date: 30 April 2017

Port Moresby Sewerage Upgrade Project

SubContractor
Work consisted of detailed bulk earthworks, access road construction, stone pitch and gabion slope stabilization, trenching, bedding backfill and trunk main sewer laying. Over 270,000 man hours and in excess of 130,000m3 bulk earthworks (cut to fill/spoil).

Amount of contract: 80 Million Kina
Name of Employer: Dai Nippon Construction
Award Date: 18 November 2015
Completion Date: 7 November 2018